Monday, 12 May 2014

Downrigger bases.

They are in position, no power on the jetty yet so it's a little more difficult to work with no electric tools. I have to cut off the excess bolt on the u clamps holding the bases on so it'll be a hacksaw & lots of cursing (a little blood ALWAYS gets spilled)!
All of the electric cables and transducer cables are in place in the boat but I ran out of battery cable termination crimps, this will be fixed and connected at the next visit.

Salmon are now being caught at Landsort so if everything works out (weather included) I will be out this week, i checked the fuel tank level & it never seems to move much, this engine is incredibly easy on diesel.....

The electrical tape in this pic will be changed for tie wraps later as I ran out.


No comments:

Post a Comment