Saturday, 3 May 2014
Downrigger work
The templates have been made for the downrigger brackets so I'll cut the steel & weld them up tomorrow, I also bolted the through deck gooseneck for the electrics & transducer cables, getting there.....
Thursday, 1 May 2014
New home
Safely moored in her new home for the forseeable future & close to the fishing grounds.
Next important jobs are getting power to the stern for all four downriggers & running the transducer cables through the boat. I also have to make four stands to bolt the downrigger bases to. Once this is done I can think about fishing.
Wednesday, 30 April 2014
Launch & a 7 hour trip.
The boat went in without a hitch yesterday, the guys held it on the trailer while I ran inside to stem the torrent of water from the stern gland after I had repacked it..... NOTHING! Not a drop of water so she came off the trailer & started on the second push of the button. Once the engine was warmed up & everything seemed to be working I pushed off on my 7 hour trip, I held the RPM at a comfortable 1800 & averaged 7.7 knots which is fine as she sips diesel like this....
After about an hour I checked the stern gland & there was a steady stream of water so I spent the rest of the trip tightning & slackening the adjuster bolts to try to get the 2 to 3 drips per minute that appears to be the recommendation, i almost have it now but I think it needs time to bed in.
Monday, 28 April 2014
Last fixing before tomorrows launch.....
Tidied up the two transducers & cut a hole in the deck at the stern to fit a "U" tube for my downrigger electronics & transducer cables. I should get that screwed to the deck tomorrow so running the cables is next & make the four downrigger supports.
Finishing up after the winter
Monday, 7 April 2014
Launch date
Got my launch date as 29th April, heading for my new marina on the 30th if there are no leaks & she starts after ripping the fuel system apart & rebuilding it!!!!
Subscribe to:
Posts (Atom)













